Pillars of reformatory church at Kalvin square in Budapest, Hungary

Work was done in 2014. on the four main entrance pillars, along with the complete reconstruction of the church. To maintain the static stability only two pillars per day were worked on for two days total. The cut was made between the pillar and the foundation and it is entirely unnoticable. Thanks to HIO-technology®the pillars are completely dry, while the walls of the church that only had a dried mortar coating had moisture stains after only a year after completion.